Request a demo

Glossary · Pipelines and tooling

What is backfill?

A backfill reruns a pipeline for past periods: to fill a gap after an outage, to load history for a new table, or to apply changed logic to old data. Done well it is idempotent and partition by partition; done badly it duplicates rows and scans all of history at once.

Also called: data backfill, backfilling, historical reload, reprocessing, Airflow backfill, dbt full refresh

When you need a backfill

  • Gaps: a source or pipeline failed for some days and the table has holes.
  • New tables: a new model or metric needs its history, not only data from today.
  • Logic changes: a bug fix or a new definition must apply to past data too.
  • Late data: records arrived after their period was processed.

Backfills on BigQuery

The safe pattern is to replace whole periods, so a rerun overwrites instead of appending. A multi-statement transaction deletes and rebuilds a date range atomically:

DECLARE start_date DATE DEFAULT '2026-10-01';
DECLARE end_date DATE DEFAULT '2026-10-31';

BEGIN TRANSACTION;

DELETE FROM `my-project.marts.daily_revenue`
WHERE order_date BETWEEN start_date AND end_date;

INSERT INTO `my-project.marts.daily_revenue` (order_date, country, revenue)
SELECT DATE(created_at), country, SUM(amount)
FROM `my-project.sales.orders`
WHERE created_at >= TIMESTAMP(start_date)
  AND created_at < TIMESTAMP(DATE_ADD(end_date, INTERVAL 1 DAY))
GROUP BY 1, 2;

COMMIT TRANSACTION;

Running it twice leaves the same rows. The filter on created_at itself, rather than on DATE(created_at), keeps partition pruning reliable on a table partitioned by that timestamp. Alternatives are partition overwrite (dbt insert_overwrite, or a query job writing to a partition decorator such as daily_revenue$20261001 with WRITE_TRUNCATE) and MERGE on a key.

Cost and quota notes

  • Size the batches. One statement over a month scans each source partition once. Thirty daily runs that each scan all history scan it thirty times. Check bytes with a dry run, and price it with BigQuery pricing or the pricing calculator.
  • Partition modification quotas. Rewriting many partitions with many jobs can hit partition modification limits; fewer, larger jobs help.
  • Concurrent DML. Parallel backfill runs against one table queue up and can fail with too many DML statements outstanding.
  • Isolate the compute. On editions, run large backfills in their own reservation, or at batch priority, so they don't slow production pipelines.

Common pitfalls

  • Non-idempotent steps. Plain INSERT appends duplicates on every rerun; see idempotent pipeline.
  • CURRENT_DATE() in transformations. The backfill computes today's answer for every past day.
  • Forgetting downstream. Rebuilding a table doesn't rebuild what reads from it; follow the DAG and backfill dependents in order.
  • Airflow catchup surprises. Unpausing a DAG with catchup=True and an old start_date triggers an unplanned backfill of every missed interval.

FAQ

How do I backfill in Airflow?

Airflow 3 runs backfills in the scheduler, started from the UI or the API for a date range. Airflow 2 uses the airflow dags backfill command. Either way, each run gets its own logical date, so tasks must use it instead of the current date.

How do I backfill a dbt incremental model?

Run it with --full-refresh to rebuild everything, or pass a date range through variables that the is_incremental() filter uses. Models with the microbatch strategy accept --event-time-start and --event-time-end to reprocess a window batch by batch.

How much does a backfill cost on BigQuery?

Roughly what the normal runs for that period would cost, plus overhead if you rebuild more than needed. On on-demand pricing, a backfill that scans each partition once costs far less than one that scans all history for every day. Estimate with a dry run first.

Read next

Browse the full glossary

Observability for every BigQuery table, in about 15 minutes

Masthead detects freshness, volume and schema anomalies, monitors pipeline errors and maps column-level lineage across all your projects, from logs and metadata only.